Blowdown Rate & Feedwater
The blowdown needed to hold the boiler TDS limit, the feedwater flow, and the heat going down the drain.
Inputs
Blowdown flow
274kg/h
Blowdown as a fraction of steam
0.0274
Details
| Feedwater flow | 10,274 kg/h |
| Feedwater TDS (ppm) | 80 |
| Makeup water required | 4,110 kg/h |
| Heat leaving with the blowdown | 53.26 kW |
| Verdict | Low blowdown — good |
Assumptions
- Steam is taken to carry no solids. With foaming or carryover the real blowdown need is higher.
- This is continuous blowdown. Bottom (sludge) blowdown is separate and intermittent, and is not included.
Continue with this result
Calculation report
A PDF carrying the inputs, results, assumptions and the source. A one-time code is sent to your address.
Source
- Kütle dengesi · F·TDS_besleme = B·TDS_kazan
- IAPWS-IF97 (R7-97) · Kazan basıncındaki doymuş su entalpisi · 2007
Results are for engineering pre-assessment and are not a product selection commitment. Final responsibility rests with the user.